Living afloat
The story of the Luxe Motor Watergeus, the Groningse snik Hornblower, the klipperaak Aquarel, the lemmeraak 'Op Hoop van Zegen', the Friese maatkast Tordino and how to convert a Dutch barge into a houseboat.
 
MS Watergeus
Watergeus
The Watergeus is my home. It's an old Dutch Luxe Motor, built in 1929. She was about to be scrapped when we bought her...
History
Conversion
Photo Gallery
Specifications

Books
 
Living Afloat
(and old stuff - outdated)
Living Afloat
Living Afloat gives you free ideas on what you need to know about barges, how to buy them, how to convert them, etc..
Recognize a barge
Buying a barge
Converting a barge
Barge to the yard
Safety on a barge
Converted barges
Barge stories!
Waterways & harbours
Questions?
Photo Gallery
FAQ
Links
 
Photo Gallery
 
 
MS Tordino
The Tordino is a Friese Maatkast built in 1922. She is being converted into a floating museum.
 
MS Aquarel
The Aquarel is an authentic klipperaak from 1916 converted for exhibitions and with a permanent small museum of maritime artifacts. She was sold in 2016 and is now a houseboat in Zaandam.
 
MY Op Hoop van Zegen
Op Hoop van Zegen
The 'Op Hoop van Zegen' is a lemmeraak from 1916. She was converted into a classic looking yacht.
 
WEBLOG
I spent most of my time in or around boats. Read what I'm doing!
MS Hornblower
The Hornblower was a project of converting a snik into a yacht. I sold her in 2014 to start another project.
 
HomeAquarelConversion • August 2014

August 2014

15th August 2014

A national holiday on a Friday. This is perfect for a long weekend of working aboard the Aquarel. The only element I couldn't count on was the weather. The whole day was raining. Anyway, I managed to weld the remaining supports for the hatches. At least when it is stormy, I don't have to worry to much about losing them.

Heavy rain continued and therefore it was necessary to work inside. The metal framework for the watertanks was welded. The watertanks float above the wooden floor. In case I have to weld at the yard, I can get access to the bilges without moving my tanks.

16th August 2014

Nice weather, slightly cloudy. I had two thick sheets of metal for the mast support. This needs to be strong since it has to hold a serious weight in the near future. It took us all day to make the support and a waterproof casing for the foot of the mast.

21st August 2014

Since the welding around my kitchen is finished I can concentrate on the woodwork again. It took me some time to mount the frame and the steel wires to hold the insulation. I'm surprised to see how much insulation that goes into a small area... Anyway, by the end of the evening the wall was finished to hold the kitchen sink and the other units.

23rd August 2014

Painting time. My mother came to paint the wheelhouse. By the end of this fine day, we got most of it done.

While she was painting, I continued on that kitchen. I would have been bankrupt if I was working for other people building a kitchen. Never thought it would take me that long...

15th August 2014

A national holiday on a Friday. This is perfect for a long weekend of working aboard the Aquarel. The only element I couldn't count on was the weather. The whole day was raining. Anyway, I managed to weld the remaining supports for the hatches. At least when it is stormy, I don't have to worry to much about losing them.

Heavy rain continued and therefore it was necessary to work inside. The metal framework for the watertanks was welded. The watertanks float above the wooden floor. In case I have to weld at the yard, I can get access to the bilges without moving my tanks.

15th August 2014

Nice weather, slightly cloudy. I had to thick sheets of metal for the mast support. This needs to be strong since it has to hold a serious weight in the near future. It took us all day to make the support and a waterproof casing for the foot of the mast.

21st August 2014

Since the welding around my kitchen is finished I can concentrate on the woodwork again. It took me some time to mount the frame and the steel wires to hold the insulation. I'm surprised to see how much insulation that goes into a small area... Anyway, by the end of the evening the wall was finished to hold the kitchen sink and the other units.

30th August 2014

The cube for the the mast foot was welded today and tested. It was filled with water and only a few drips came out in the hold. It got another weld so it is watertight. The support was welded as well and the first bracket for the arm of the mast. The weather stayed dry so all the outside welding was done. My neighbours had a wedding party so we didn't make it to late. A nice day and a lot of progress!

 
site mapcontactupdates
Contact
Last updated on: Tuesday, 7 March, 2017 11:01 PM
(c) Frederic Logghe - Living Afloat.com 2004-2017
We are not responsible for, and expressly disclaims all liability for, damages of any kind arising out of use, reference to, or reliance on any information contained within the site.