18th November 2006 – This morning, a big surprised had happened. The metal work was finished from the outside. The inside, ribs and welding the bulkhead still needs to be done.

My electrician repaired the 24 volts in the back accommodation, not an easy job since all cables were hidden behind the paneling.

Since Lore was moored next to my boat an a lot of work needed to be done on her spits barge, I decided to help her a hand.