21st April 2007 – Since I didn’t work on my barge the last couple of weeks, I made an effort and worked from six in the morning till nine O’clock in the evening. The roof is finished and one side has already been closed with pe-sprays. Instead of the gangway, we made a nice entrance in wood. Further, the area for the bathroom was cleared and a trial model of the floor was created.

I repaired my extensions cables, since most of them had their best life behind. It’s getting time to by some new ones. The water pump was moved from the inside to the outside. Always handy to have it ready.