13th April 2008 – I can now honestly say the floor is finished. A third layer has been put, so I believe it will be solid enough for he next couple of years. After a first layer of wood and multiplex, a second layer with wood and insulation, the last layer is again multiplex. On top of the multiplex, I’ll add a decent floor in the future.

Furthermore the original shipping floor in Azobe wood that is saved was put back in the hold.