20th July 2008 – We continued with putting sheets of multiplex on the sides. The more plates are placed, the smaller the space looks, but the more it is getting the final shape, how it should look, it looks!

In the afternoon we placed the floor of the corridor, the same floor as in the office space; reused azobe. I don’t know what I did wrong, but while drilling so many smoke came that we had to go outside. In the end I continued drilling, but couldn’t see my machine anymore. It took four hours, but the result is good. I like it (and that’s why I’m doing it)!