4th October 2008 – The floor of the living room was finished. Some shelves on the bottom of the library had to be made, so we did this as well.

In the morning, my neighbour and I went to the scrapyard with pieces of our ship, 280kg’s of metal, 2kg copper and 11kg aluminum! If I would have cleaned out my engine room and fore peak, it would have been doubled, but neither did I have the time or interest to clean them out…