3th January 2009 – We did a lot of work today. Not only has the furniture been mounted in the sleeping room, we also insulated the corridor to the living room and started the engine.

 

In the morning I started insulating the corridor, one of the last places with no insulation. The other one is the bathroom. In the afternoon, with the help of my parents, the furniture was put in position.

In the evening I put some anti-freeze in the engine and ran it. Why? Well it was not freezing today (around 6°C), so I could easily ran the engine. Maybe I should have taught about this last month…