28th April 2009 – Since we didn’t have all the pieces for the water system, the tanks were connected to the pump and that’s it for the plumbing today.

I started building the first wall in the forecastle. I tried a few possibilities and ideas since I want to have the maximum of space out of this small area. When it was dark I had to stop working, but at least half of a frame is standing.