Month: April 2012 - page 2

Hornblower – Railing (2)

7th April 2012 – Today we put the railing pipes on their feet. The old feet still need to be cut. It might give a wrong impression, but I won’t use them as a fender or to keep boats away in a lock…

 

Last week, when welding a bulkhead in the engine room, a rotten pipe felt through the hull. Since this hole is only seven centimeters above the waterline, it is now closed by welding a little patch on it. I could have used fiber or something else, but it would not feel safe.

 

Hornblower – Railing

6th April 2012 – The ship had a railing on only one side. We never had the time to finish this project in Sluiskil. It certainly is not the most important job, but it looks nicer. When I’m going to the yard in May, I don’t want to carry all these length of pipe with me. They are now stored on the hatches of the Watergeus.

Today I cut the feet for the railing and welded them on the boeisel of the ship. A very time consuming job! Welding RVS pipe on metal is not that easy.