30th March 2013 – The outside of the accommodation wasn’t painted for two years. I have been welding and cutting, mounting new windows, etc… Most of the paintwork was in a bad condition. Time to remove it and give it a good coat of new paint.

By the end of the evening, most of the paint was gone. To do something else to finish the day, I made a box around the pump and boiler, and I mounted two gauges for the engine.