14th July 2014 – I have enough of the hold. To much stuff, I can’t walk around or move a single sheet of multiplex without hitting at least ten other things…. I had some water in the bilges yesterday and I can’t get to it properly because my stuff is at that location. All those things were working slightly on my nerves. The deal for today: just cleaning, no construction work!

At the end of the evening, I could slightly walk around and started doing some work anyway. All the welding joints of the roof will be sealed with silicon on the inside of the boat. Briefly calculated, there is about 180 meters where I have to put silicon. I did the bathroom area and stared insulating the den. I’m using 12cm of Rockwool. It might not be enough, but for the purposes she will be used it is ok.