20th December 2014 – Dry weather, but a lot of wind. I decided for a go and cut a few holes in the ceiling. One was for air ventilation at the entrance of the hold. The second one was for the chimney pipe. The cutting was the easiest part. It took some time since I had to run downstairs several times to check if everything was safe. I had nobody to help me with checking for fire or smoke…