26th August 2015 – I only had half a day to work. I built the stage or floor for the toilet. Complex areas like kitchen, bathroom and toilets are built on a stage. In case there is a welding job at the bottom of the ship I don’t have to rip out the whole room with all the plumbing around it. It is going to be a small room since I like to keep the hold as big as possible.