20th September 2015 – The idea was to work a whole day. Sadly enough, the evening before was a late one and I had a small hang over. I continued with the water system. I have now done the big runs with the pipes. It did take me much more time then expected, certainly when you are on your own. Now the pipes are done, I can concentrate on finishing the last side of the hold putting wood and t&g. Once this is over, most woodwork will be done.