3rd March 2017 – My wood arrived. It didn’t look that much till I had to start bringing it aboard. The wooden beams of 6.7m long were heavy. With the two of us we managed to lower them in the hold. Sadly enough it was raining the whole morning while we were loading the wood.

I build the frame for the Library room in the afternoon. It seems easy, but over 1000 screws were used to connect the beams together.