16th February 2018 – I finished the ceiling today, at least one length. The other side will be for later. I still need to build the frame to hold it. Therefore the wall needs to be finished with t&g first.
The result is a good looking roof and I’m satisfied. A lot of energy and planning went into the concept, but it feels good. You keep the lines of the hold and the height.