16th June 2022 – With over 30°C outside, it was hard to work.  Anyway, I wanted to have done something so I drilled two holes, one in the sink to mount a tap and one in the hull for the waste water of the sink. It became warmer and warmer so I went to the shop, spending one hour measuring and checking what pieces I needed. It is the first time I came home with the right pieces and I didn’t buy to many!

If I hadn’t forgotten the teflon, the whole plumbing would have been finished in the kitchen…