Stern – a small bit of t&g

1st March 2021 – I had to do something on the Stern. Nice weather and I hadn’t been aboard for a whole week. I just removed the old panel of the back bulkhead to get access to the rudder and battery. I added some t&g and then it was dark..

Tordino – Cleaning and painting

23rd February 2021 – I sanded down the cabin on port side and gave it a fresh coat of white paint. The new entrance also got it first coat. It is starting to look a bit more like  an integrated entrance. I had some trouble connecting the hose for the drainage of the water. It is now attached to the pipes, but it certainly needs adjusting. The pipe is no standard size so I will have to buy a bigger hose. 

At the end of the afternoon, I went to the other side of the canal to take some more pictures. 

Tordino – Another day of work for the entrance

20th February 2021 – We started early in the morning we were stopped yesterday. With a heavy jack we managed to get the cabin in position, a tricky and dangerous operation where many things could go wrong. Having the right tools is half the job. Not being afraid the other half. 

I could not take many pictures since I was holding the tools or the cabin so it would not fall in the water. At the end of the evening we didn’t finish all the welding. Another day is necessarily to finis the job.  Before going home I cleaned most of the grinding dust from the deck. 

Stern – Wheelhouse

19th February 2021 – Still disappointing about this morning, I went to have a look at the Hornblower where they are rebuilding her. It motivated me to start on the Stern. Aboard the Stern, I did some t&g around the cupboards in the wheelhouse and around the windows. I cut the remaining expanded foam as well.

One serious day of working and most of the wheelhouse should be finished.