2nd November 2006 – I woke up, wasn’t to happy about the night, had a coffee with the neighbor and went for a short walk, before working. He moored his ship very loosely and made a lot of noise.

It was raining all morning, so I cleaned the wheelhouse and my technical room (extension to the engine room). The two dirty water tanks are placed on one side, my generator on the other side. In the middle I still have enough space for another two tanks. I also painted one side of the newly created watertight compartment.

In the afternoon, an electrician came to have a look at both my 24v installation and my future 220v system. Later that day, when the weather became better, we continued working on the sides.