2nd February 2008 – Since the metal for the ribs still hasn’t arrived, I decided to build a floor in preparation for the water tanks. Under the front cabin, I cleaned the whole area and started putting a floor. I’ll hope to finish it during the week, so whenever the water tanks arrive, I can place them straight away!
The floor is build on the same idea and with the same structure of the big floor in the hold.