29th June 2008 – Having a short night, and a little headache, I started working at 9 o’clock. Besides ding some more insulation (halve of the hold is done now), I made a floor for the corridor and the entrance. I used the remaining azobe wood. What was still left and seemed useless, I gave away a few ships further. A heavy job, but by the end of the evening, the hold looked pretty clean and it was more easy to get an idea of the size of the rooms.

After building the floor in the office space last time, I had some azobe wooden planks left, not much but enough for the corridor and the entrance. Only I had several different sizes of them. By the time I moved all of them several times, I found enough for the corridor. The entrance was built with what was left.

Since I didn’t like throwing away all the wood, I decided to keep some for making stairs, etc…