9th November 2008 – Worked in the bathroom, preparing the panels for the side. I can’t fix them yet since water pipes, electricity and insulation have to be put. Since I had some time left and didn’t know what else to do, I cut all the panels and put them in the bathroom. Saves time somewhere next year when building the bathroom.