15th January 2012 – The main area for this month and probably February is the engine room. The fuel tanks are nearly in position. They are on their own supports, but I might have to move them a few centimeters towards the side. When I built the construction, I had 2cm spare, now I can’t even put a sheet of paper in between the two tanks…

I was able to raise the watertank and to make new supports for it. They are bolted, I will weld the whole construction on a later stage.

I can’t wait to paint the bilges and put the aluminum floor on the ribs. It will certainly look much better then it once was…