1st November 2013 – The plan is to build a new floor in the cargo hold by the end of the year. I want to be able to walk freely around. Step one was to remove the old flooring. Seems easy, just cut the planks and lift them out. Sadly enough, when they doubled the bottom of the ship, bolts were mounted through the original metal hull into that wood. This a method I’ve never seen before.