29th January 2014 – Since the floor is nearly finished I can start thinking about framing the hold. This looks easy, but it needs a lot of planning. I want to keep the maximum of space, but I need to have ten centimeters between the framework and the metal for spraying insulation foam.

At the end of the evening, I managed to build a sample of the frame for the den. To clear my mind, I painted some more of the metal in the hold….