3rd September 2015 – As mentioned before I hate plumbing. The fitting I drilled through the hull had been leaking. Not much, but a ship should be dry and so I asked my neighbour to help. With the two of us I was able to give a few more turns and tighten it up. A new layer of silicon and it was dry!

One wall in the toilet had to finished, so I did.