5th Augusts 2018 – After a good night sleep, we started the engine and headed for Gravesend. At Southend, we dropped anchor, had a swim and picked a crew member up from the pier. It was an old friend, who I helped two years go bringing over her barge to London.

Just before arriving in Gravesend, we dropped anchor, had a second swim and went of to the mooring It took us some time to properly get the boat in position. We had no space left and had to pull her in by hand. She is now moored in a nice small dock with a lightvessel and a Thames Sailing Barge. The old tug Kent is on the other side of the pontoon.