13th January 2020 – A last difficult bit is building the frame around the old lifeboat. I can’t get to it, but I can’t move the boat either. It took me some time, but I managed to build the wall and building the top side was easy since I could stand in the boat. A lot was done this evening.

Since the lock in Bruges was broken, a pusher came  alongside with a pontoon. They stayed for the night.