Month: August 2020 - page 3

Stern – Painting the upper structure and building a wooden frame

2nd August 2020 – The day started badly with heavy rain, but it stayed dry aboard the Stern. That gave me a good feeling.  I painted the upper structure, knowing the paint might get damaged by the welding of the wheelhouse in the future. At least the ship is starting to look good. Black hull, black deck, sides in brown and a green roof.

In the evening, I started building a cupboard on starboard side.

Visiting a spits barge in Evergem

1st August 2020 – A person I once met through facebook called me about his spits barge that might go to the scrapyard. We went to Evergem and had a look. It is nice old spits barge with some history. It has a beautiful accommodation. I sincerely hope there will be future for the ship.

Once the visiting was over, the owner invited us to his place for a drink and a chat. Boats bring people together.