11th April 2021 – I started by running the bowthruster and generator. Then I sorted out the rope work so every rope is on a single bollard. Being moored for two years, having had a lot of loaded barges alongside, I often added a few ropes or just redid them.

It was to windy to work outside, so I cut the wall between the old and new entrance. I tried moving the supports for the stairs, but they are to heavy for me to lift.