17th-18th June 2006 – A ‘clean-up’ weekend, in which I got rid of most of the oil in my engine room. After cleaning most of it, I could again see the rivets on the bottom of the vessel. More then 600 liters of old fuel and contaminated water were hovered out and put into oil tins. A job that took most of the time during that weekend. A total of over 1200 liters were removed and I’m pretty sure, there is still some left!
Furthermore, the front cabin was painted. I chose a light color to make it look bigger. Because of the temperature, the paint dried very quickly. At the end of the evening, I was already able to put all my stuff and ropes back.