Month: February 2016

Aquarel – Flooring

9th February 2016 – I started building the floor of the kitchen. A slow progress. I need to cut every plank so I can use the old hatches for inspection. I just know the kitchen area is the worst and I probably have to redo the plating in this area when I go to the yard. It is still leaking underneath. I have control over the situation and with the hatches, I can keep it like this!

Therefore I used a thicker t&g for the floor. Once I’m back from the yard, I will look for a quality floor.

Aquarel – Painting the kitchen

4th February 2016 – Planning, this is the word at the moment. I’m not able to do much. I ‘ve painted the kitchen together with my mother. She helped me on the positions I couldn’t get to at the moment.

Wheel of an old light vessel. Will be part of the museum aboard Aquarel.