3th September 2006 – After a hard night we started working again. I didn’t sleep because of the loaded spits barge next to me. The boat was only connected to my boat and not to land… Ropes were loose and it was heavily loaded.
In the morning we created a first rib that should hold the plates. The ribs had to be rounded to keep curve the platform. We used metal strips and curved them ourselves.