22th February 2007 – In the morning, since the weather was dry, I painted the main entrance in black, according to the rest of the boat’s style.
While the first coat of paint was drying, the windows for the kitchen and bathroom were placed. Since I couldn’t drill with my hand, which is till not healing, the holes could not be re drilled to match the windows.
In the afternoon, I made a trip with Rinus’ new boat, the 1929 build Arma. She is a maatkast built on the dimensions for sailing through Friesland. It was a small but relaxing trip.
While sailing on the Arma, the welder started working on my bulkhead, the last thing that needed welding before leaving Sluiskil.