5th September 2007 – All ribs are placed, but if we would not put something between to hold their width between each other, they would start to wave. We will cut metal strips and put them between each rib. The more he puts the better; it is a good start for putting my wood against when doing the interior.
By the end of the afternoon all pieces were welded between the ribs. This made the roof structure very solid. Before you could move the ribs and make them wave; now you couldn’t. The whole structure will be finally welded tomorrow. Then it has all its strength to hold the plates.