9th May 2009 – During the day we did the other side of the living room in pine. A few little gaps on the side were filled as well. I think with another two days the whole living room will be ready for painting.
9th May 2009 – During the day we did the other side of the living room in pine. A few little gaps on the side were filled as well. I think with another two days the whole living room will be ready for painting.