30th August 2009 – Another inspection hole was built, two more to go and I can build my finishing floor. Since the remaining wood is stored where the holes need to be built, I can’t do it right now.
30th August 2009 – Another inspection hole was built, two more to go and I can build my finishing floor. Since the remaining wood is stored where the holes need to be built, I can’t do it right now.