31st August 2009 – My second anchor is on the front deck. Thursday, a friend is coming with a crane. I moved the chain through it’s gate and dropped it along the hull. I hope to put my anchor in position if the crane is long enough. I cut the anchor loose from the ship since it was welded a few years ago.
I built a small box for the heating element near the water tanks. Only a small wall was needed, but by the time I was finished it was also a work bench and storage space.
In the late evening, I cleaned another part of the deck. The idea of cleaning a square meter a day is not realizable.