4th September 2009 – Today they delivered the floor for the kitchen and living room. Since every piece was over five meters in length it was a big job to get it aboard.
In the afternoon they called to tell me the heating system, pallets and heating elements would be delivered today instead of tomorrow. A bit surprised I had to make some more room in the living room. When the truck arrived I was even more surprised by the volume of pellets that had to enter the hold.