28th September 2009 – The heating elements were connected, the system was filled with water and the heater was ran. It was another big step in the conversion project and most likely the one I will like most in winter time.
28th September 2009 – The heating elements were connected, the system was filled with water and the heater was ran. It was another big step in the conversion project and most likely the one I will like most in winter time.