16th January 2015 – My intention to finish the ceiling by the end of December was a failure. A new deadline is the end of January. Today I finished most of the insulation and the first layer of wood. The hold looks dark at the moment because of the brown multiplex. Working with no daylight often causes me a bit of a depression.
My hold still contains stuff I need to put elsewhere. Since I put on my roof in March last year, a lot of tools and parts were stored in the main hold. They need to be in my workshop. There is now a wooden wall that divides the hold in two. To have access to my workshop, I need to go outside. My parents came to help me moving all this stuff. By the end of the afternoon, the main hold looks emptier. I can walk around and finish the ceiling without stepping onto everything.