20th January 2018 – In the early morning, I mounted OSB on top of the frame from the old accommodation. I can now walk on it to finish the walls above and to build the ceiling of the hold.
In the afternoon, I lifted and mounted an 80kg wooden beam for the support of the ceiling. I had to move it up to a height of 3m30. Wit a wooden construction, a few screws and a rope, I managed to get one side right. The other side needs to be another 20cm higher, but I had no strength left, neither was my temporary construction strong enough to hold any more pressure. Will be continued…