27th January 2018 – The roof of the old cabin will be done in pine wood, painted creme white. The same will be used fot he back wall of the sleeping room and kitchen. I had 20 packages of t&g left, they all went up in that one ceiling.
27th January 2018 – The roof of the old cabin will be done in pine wood, painted creme white. The same will be used fot he back wall of the sleeping room and kitchen. I had 20 packages of t&g left, they all went up in that one ceiling.