12th October 2019 – We started with the back accommodation. The cupboards in the bedroom downstairs were falling apart and several shelves were missing. I rebuilt them and gave a good coat of primer at the end of the evening.
Old tape was removed from the good shelves. The stairs were covered by old carpet. The freezer who had not been used for at least three years was also thrown away. New wires were put behind the walls with proper sockets and switches.