24th February 2020 – Another day of breaking down the interior. I had to use electric tools to cut away the walls and parts of the kitchen. The kitchen was looking good, but it was totally rotten. This was the only area I doubted keeping…
The construction of the upper structure was well done, but the wrong materials were used, so it lasted it maximum lifetime. The plywood of the roof was joined with an aluminium strip. It leaks through this strip. This is the main reason the bathroom was rotten.
The insulation and the ceiling is gone. Now I still need to remove the sides and the bench. A job for Wednesday.