28th March 2020 – It was getting windy and painting was no option. I painted the railing but had to stop. Since I was still aboard, I did some smaller jobs in the bathroom, kitchen and sleeping room.
In the afternoon, I went back to the Watergeus.
28th March 2020 – It was getting windy and painting was no option. I painted the railing but had to stop. Since I was still aboard, I did some smaller jobs in the bathroom, kitchen and sleeping room.
In the afternoon, I went back to the Watergeus.