6th September 2020 – I started late today, had a good sleep first. The toilet is the next room I want to work on. I changed the support for the toilet and continued with t&g.
In the afternoon, we moved the Stern behind the Watergeus for welding. A lot needs to be done, so it was easier moving her behind me where the mooring is free at the moment. I had no time of taking pictures since we were with three and all needed both our hands.