11th September 2020 – Another day of mounting metal and welding. One more sheet had to be put in position and a part of the strip around the roof. Some of the welding was tricky since wood was nearby and I could not remove it.
In the evening, I closed a leak in the deck. The ship should be dry now if it rains.