23rd February 2021 – I sanded down the cabin on port side and gave it a fresh coat of white paint. The new entrance also got it first coat. It is starting to look a bit more like an integrated entrance. I had some trouble connecting the hose for the drainage of the water. It is now attached to the pipes, but it certainly needs adjusting. The pipe is no standard size so I will have to buy a bigger hose.
At the end of the afternoon, I went to the other side of the canal to take some more pictures.