14th & 15th January 2006 – We placed a generator aboard for making power so we could use the tools needed for cleaning. We also got a gas bottle for the heating.
We decided to start cleaning the cargo hold. Removing leaves, water and rubbish from the bilges. In one day time, most of it was cleaned and with the wooden planks left in the hold, a floor was created. We hadn’t enough for creating the whole floor. A few were missing, but the result looked satisfying.
The next day, the wooden floor was cleaned with a high pressure machine.